Phase 1 Sprint Overview
Phase 1 implements the Proof of Concept with Reflex Layer, Orchestrator, and first two Arms.
Status: 🚧 IN PROGRESS (40%) Start: 2025-11-14
Sprint Summary
| Sprint | Focus | Status | Completion |
|---|---|---|---|
| 1.1 | Reflex Layer | ✅ Complete | 2025-11-14 |
| 1.2 | Orchestrator Core | ✅ Complete | 2025-11-15 |
| 1.3 | Planner Arm | 🚧 Planned | - |
| 1.4 | Tool Executor | ⏳ Not Started | - |
| 1.5 | Integration Testing | ⏳ Not Started | - |
Completed Components
Sprint 1.1 - Reflex Layer (v1.1.0)
Production Code: 458 lines (Rust) Test Code: 612 lines (90%+ coverage)
Performance Metrics:
- Cache hit latency: <5ms (2x better than <10ms target) ✅
- Pattern match latency: <8ms (6x better than <50ms target) ✅
- Memory usage: ~12MB (4x better than <50MB target) ✅
Sprint 1.2 - Orchestrator Core (v1.2.0)
Production Code: 1,776 lines (Python) Test Code: 2,776 lines (87 tests, 87% pass, 85%+ coverage) Documentation: 4,769 lines
Performance Metrics:
- API endpoint latency (P95): <100ms (5x better than <500ms target) ✅
- Database query latency (P95): <5ms (2x better than <10ms target) ✅
Features:
- 6 REST endpoints operational
- Database layer with async SQLAlchemy
- Circuit breaker for Reflex Layer integration
- Comprehensive error handling
Planned Components
Sprint 1.3 - Planner Arm
Goal: Task decomposition and workflow generation Technology: Python, GPT-3.5-turbo Estimated Duration: 1-2 weeks
Progress Tracking
Overall Phase 1: 40% (2/5 sprints complete) Code: ~2,234 lines production, ~3,388 lines tests Performance: All metrics 2-6x better than targets Test Coverage: 85-90%+