Phase 1: Proof of Concept

Status: Not Started Duration: 4-6 weeks Team Size: 3-4 engineers (2 Python, 1 Rust, 1 generalist) Prerequisites: Phase 0 complete Start Date: TBD Target Completion: TBD


Overview

Phase 1 builds the minimal viable OctoLLM system with core components: Reflex Layer, Orchestrator, and 2 Arms (Planner and Executor). This phase proves the architectural concept and establishes the foundation for all subsequent development.

Key Deliverables:

  1. Reflex Layer (Rust) - <10ms preprocessing, PII detection, caching
  2. Orchestrator MVP (Python) - Task planning, routing, execution
  3. Planner Arm (Python) - Task decomposition with GPT-3.5
  4. Executor Arm (Rust) - Sandboxed command execution
  5. Docker Compose deployment - All services running locally
  6. E2E tests and demo - Working task submission to completion

Success Criteria:

  • ✅ All 4 components deployed and healthy
  • ✅ E2E tests passing (>90% success rate)
  • ✅ Latency targets met (P99 <30s for 2-step tasks)
  • ✅ Security tests passing (no sandbox escapes)
  • ✅ Demo video recorded (5 minutes)
  • ✅ Documentation updated

Reference: docs/doc_phases/PHASE-1-COMPLETE-SPECIFICATIONS.md (11,000+ lines with complete code examples)


Sprints

Sprint 1.1: Reflex Layer [Week 1-2]

Tasks: 8 implementation tasks

  • Implement Rust service with Actix-web
  • PII detection (18+ regex patterns)
  • Prompt injection detection
  • Redis caching with TTL
  • Token bucket rate limiting
  • Performance optimization (>10,000 req/sec)
  • Unit tests (>80% coverage)

Reference: docs/components/reflex-layer.md (2,234 lines)

Sprint 1.2: Orchestrator MVP [Week 2-3]

Tasks: 12 implementation tasks

  • FastAPI application setup
  • TaskContract Pydantic models
  • Main orchestration loop
  • LLM integration (OpenAI/Anthropic)
  • Database integration (PostgreSQL, Redis)
  • API endpoints (POST /tasks, GET /tasks/{id})
  • Unit and integration tests

Reference: docs/components/orchestrator.md (2,425 lines) Reference: docs/implementation/orchestrator-impl.md (1,596 lines)

Sprint 1.3: Planner Arm [Week 3-4]

Tasks: 6 implementation tasks

  • FastAPI service setup
  • Task decomposition with GPT-3.5
  • SubTask models and validation
  • Dependency resolution
  • Testing with mock LLM responses
  • 90% success rate on test tasks

Reference: docs/doc_phases/PHASE-1-COMPLETE-SPECIFICATIONS.md (Planner Arm section)

Sprint 1.4: Executor Arm [Week 4-6]

Tasks: 8 implementation tasks

  • Rust service with capability-based security
  • Docker sandbox execution
  • Command allowlisting
  • Timeout enforcement
  • Provenance tracking
  • Security hardening (seccomp, resource limits)
  • Security testing (no escapes)

Reference: docs/doc_phases/PHASE-1-COMPLETE-SPECIFICATIONS.md (Executor Arm section) Reference: docs/security/capability-isolation.md (3,066 lines)

Sprint 1.5: Integration & Demo [Week 5-6]

Tasks: 5 integration tasks

  • Complete docker-compose.yml
  • E2E testing framework
  • Test scenarios (3+ diverse tasks)
  • Demo video recording
  • Documentation updates

Reference: docs/operations/docker-compose-setup.md (1,794 lines)


Detailed Task Breakdown

Total Tasks: 50+ implementation tasks Total Code: ~5,000 lines (Python + Rust) Total Tests: ~2,000 lines

Task Categories:

  • Setup & Configuration: 8 tasks
  • Core Implementation: 25 tasks
  • Testing: 10 tasks
  • Security: 5 tasks
  • Documentation: 2 tasks

Acceptance Criteria Per Component:

See MASTER-TODO.md Phase 1 section for detailed acceptance criteria for each sprint.


Phase 1 Completion Checklist

  • Reflex Layer Complete

    • P95 latency <10ms
    • Throughput >10,000 req/sec
    • PII detection >95% accuracy
    • All unit tests passing
  • Orchestrator Complete

    • Task submission working
    • LLM integration functional
    • Database persistence working
    • All API endpoints tested
  • Planner Arm Complete

    • Generates valid 3-7 step plans
    • Dependencies correctly ordered
    • 90% success rate on test tasks
  • Executor Arm Complete

    • Sandbox execution working
    • No security test escapes
    • Timeout enforcement verified
  • Integration Complete

    • Docker Compose deployment working
    • E2E tests passing (>90%)
    • Demo video recorded
    • Documentation updated

Next Phase: Phase 2 (Core Capabilities) - Build remaining 4 arms and distributed memory